From 68558991a42d5d48b5897493e4149e81c728283d Mon Sep 17 00:00:00 2001 From: Jonathan Thornburg Date: Fri, 25 Aug 2006 17:51:00 +0000 Subject: [doc] use same terminology for PUGH as for Carpet when describing scheduling This patch changes the description of the PUGH scheduling algorithm to use the same term "main loop over time steps" as does the Carpet algorithm. (Previously the PUGH description just said "main loop".) darcs-hash:20060825175109-b0a3f-1260dfb6e71dad57103627c2f8eb680c475dedce.gz --- Carpet/doc/scheduling.tex | 5 +++-- 1 file changed, 3 insertions(+), 2 deletions(-) (limited to 'Carpet/doc') diff --git a/Carpet/doc/scheduling.tex b/Carpet/doc/scheduling.tex index dbad0c656..ddda8be8c 100644 --- a/Carpet/doc/scheduling.tex +++ b/Carpet/doc/scheduling.tex @@ -122,8 +122,9 @@ OutputGH \end{minipage}} \\ \fbox{\begin{minipage}[t]{0.1\textwidth} -main\\ -loop +main loop\\ +over\\ +time steps \end{minipage} \fbox{\begin{minipage}[t]{0.87\textwidth} Advance time\\ -- cgit v1.2.3